Card Lock System Installation

Card Lock System Installation

We run the survey, installation, software setup and commissioning of Mifare hotel room locks end to end — including the reception encoding station and staff training.

A card lock project is not just fitting a lock to a door: choosing the right case for the door type, designing the card hierarchy and making sure staff use the system correctly all have to be handled together. At ETS Elektronik we run that entire process from a single source.

How The Process Works

  • Survey and door analysis: Door thickness, frame type (timber, aluminium, PVC, steel) and existing case dimensions are established on site.
  • Model and case selection: The lock model and slim/thick case alternative are chosen to suit the room concept and door structure.
  • Installation: Locks and cases are fitted to the doors; on existing doors a retrofit installation avoids replacing the door.
  • Software setup: The card encoding station is installed at reception and the room plan and card authority levels are entered.
  • Commissioning and testing: Every room is tested individually and master and housekeeping cards are verified.
  • Staff training: Reception and technical teams are trained on check-in/check-out, cancelling lost cards and reporting.

What Is Delivered

  • Lock and case installation per door
  • Reception card encoder unit and software (Turkish / English)
  • Handheld terminal for field auditing
  • Master, floor, technical service and guest card sets
  • Commissioning report and user documentation

Working In Operating Hotels

We split the installation plan into phases so your room sales are never interrupted. We work floor by floor, and each room completes its install, test and handover cycle within the day.

Frequently Asked Questions

We have gathered the questions we hear most often. If you cannot find your answer here, get in touch and our team will come back to you shortly.

Do I need to replace my existing doors?

Usually not. With our standard case dimensions a retrofit installation can be made on existing doors. Your door structure is examined during the survey and a suitable model is selected.

How long does installation take?

It depends on the number of rooms and the door structure. Our teams work floor by floor and a room completes its install, test and handover cycle the same day. The project plan is finalised after the survey.